NASG
Store
News
Events
Clubs

Former Layout by Vic Cherven

Layout Name:

"The Sacramento Division"

Layout Status:

dismantled

Track Type:

S

Layout Space:

19' x 45'

Layout Style:

Loop-to-loop, part "mushroom" style

Track Manufacturer:

handlaid; BK Enterprises, Earl Eshelman

Rail Size:

code 100, 125, 148, 172

Min. Turnout Frog:

#4

Min. Radius:

36"

Ruling Grade:

2.2%

Track Height(s):

40" to 72"

Mainline Track Length:

~300'

Era:

Autumn 1954

Setting:

Overland Route from Sacramento over Donner Pass

Control System:

DC

Featured In:

NASG Dispatch, Jun 1993, pg 18

Notes:

Started by Vic, Jr. and Vic, Sr. The layout evolved over the years. It supported original A.C. Gilbert equipment, so a lot of the turnouts were closed-frog type. Later track started to be more "scale" like.

Layouts
Product Gallery
How-to
Resources
Site